This calculator sizes a bunker silo based on total tonnes of silage and desired pit dimensions. It computes volume needed, required pit length, plastic cover area (with 20% overlap), and estimated compaction time. Critical for silage quality and storage planning.

Planning 100 tonnes of corn silage (700 kg/m³ density) in a 6 m wide × 3 m high pit: volume = 100,000 ÷ 700 = 143 m³. Pit length = 143 ÷ (6×3) = 7.9 m. Plastic cover = ~150 m² × 1.2 overlap = 180 m². At 25 tonnes/hour compaction, ~4 hours of tractor traffic needed for proper density.

📊 Results

Required Volume (m³)-
Required Pit Length (m)-
Plastic Cover Area (m²)-
Recommended Density (kg/m³)-
Estimated Compaction Time-
Silage Quality Note-

Expert Reviewed: This calculator and its content have been reviewed by agricultural experts. Formulas are based on NRC, FAO, and university extension recommendations. For site-specific advice, consult your local agronomist or veterinarian.

📖 How to Use This Calculator

Select silage type (corn or grass — affects density). Enter total tonnes of silage, pit width in meters, and pit height in meters. Click Calculate to see volume, required length, plastic area, and compaction estimates.

🌾 About This Tool

The Silage Preparation Calculator helps plan bunker silo construction. Proper compaction density (600-700 kg/m³) ensures anaerobic fermentation and prevents spoilage. FAO recommends filling pits quickly (1-3 days) and sealing immediately.

🧮 How the Calculation Works

Volume = tonnes × 1000 ÷ density (kg/m³). Pit length = volume ÷ (width × height). Plastic area = (top + 2 sides + end) × 1.2 (20% overlap). Density: corn 700 kg/m³, grass 600 kg/m³. Compaction: aim 1/4 tonne silage per 100 kg tractor weight per minute.

📊 Real-World Example

Corn silage 100 t. Density 700 kg/m³. Volume = 100,000 ÷ 700 = 142.9 m³. Pit 6×3 m: length = 142.9 ÷ 18 = 7.94 m. Surface = (7.94×6) + 2(7.94×3) + (6×3) = 47.6 + 47.6 + 18 = 113.2 m². Plastic = 113.2 × 1.2 = 135.8 m².

⚠️ Common Mistakes & Tips

Common mistakes: poor compaction (causes mold and spoilage), leaving too little packing time, not sealing airtight immediately. Tip: layer silage in 15-20 cm lifts, compact each thoroughly. Fill in 1-3 days. Use 2 layers of plastic with weight on edges. NRC recommends silage DM at 30-35% for best fermentation.

📚 References

❓ Frequently Asked Questions

What density should silage be packed to?

Target density: corn silage 650-750 kg/m³ (30-35% DM), grass silage 550-650 kg/m³ (35-40% DM). Achieve by: filling in 15-20 cm layers, tractor weight ≥ 1/4 tonne silage per 100 kg tractor weight per minute, slow and steady packing. Poor compaction = more oxygen = mold and nutrient loss. FAO recommends testing density with a probe.

How much plastic do I need for a silage pit?

Plastic area = (top surface + two side walls + end wall) × 1.2 (overlap factor). For a 8 m × 6 m × 3 m pit: top 48 m² + sides 48 m² + end 18 m² = 114 m² × 1.2 = 137 m². Use 2 layers of 6-mil black-and-white plastic. Weight edges with tires or gravel bags. Budget for 10-15% extra for repairs.

How long does it take to fill and compact a silo?

Fill in 1-3 days for best fermentation. Compaction rate: about 25 tonnes per hour with a 50-75 hp tractor on a 30-50 tonne load. For 100 tonnes: ~4 hours of tractor work spread across the filling period. Fill layers thin (15-20 cm) and compact each before adding more. Longer fill times increase aerobic exposure and spoilage risk.

What moisture is ideal for silage?

Ideal silage moisture: corn 60-70% (30-40% DM), grass/legume 60-70%. Too wet (>75%): effluent loss, clostridial fermentation. Too dry (<50%): poor compaction, mold, heating. Test with a microwave or lab. Wilting grass for 24-48 hours after cutting to reach target moisture. NRC recommends 30-35% DM for corn silage.

How do I prevent silage spoilage?

Key practices: (1) Chop to 1-2 cm length, (2) Fill quickly (1-3 days), (3) Compact thoroughly in thin layers, (4) Seal within 24 hours of completion, (5) Use 2 layers of plastic weighted down, (6) Feed out 10-15 cm/day from the face to prevent aerobic spoilage, (7) Keep the face clean. NRC recommends monitoring temperature and pH during fermentation.